Sakura Gardens By Hre construction photos
15 photos from 3 site inspections, newest first. The percentage is how much of Sakura Gardens By Hre was built on the day of each visit.
21 September 20263.6% built
11 June 20261.4% built
22 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.








.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)




.jpeg&w=3840&q=75)