Greenz By Danube construction photos
5 photos from 2 site inspections, newest first. The percentage is how much of Greenz By Danube was built on the day of each visit.
14 October 20260.1% built
27 March 20260% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.



.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)