Skip to content

Grand Polo - Equiterra 2 construction photos

6 photos from 2 site inspections, newest first. The percentage is how much of Grand Polo - Equiterra 2 was built on the day of each visit.

29 April 20261.0% built

27 October 20250% built

Back to Grand Polo - Equiterra 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.