Skip to content

1wood Residence 2 construction photos

2 photos from 1 site inspections, newest first. The percentage is how much of 1wood Residence 2 was built on the day of each visit.

3 March 20260% built

Back to 1wood Residence 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.