Oceanz 1 By Danube construction photos
46 photos taken by Dubai Land Department engineers at 9 site inspections, newest first. The percentage is how much of Oceanz 1 By Danube was built on the day of each visit.
25 August 202650% built
7 May 202632% built
24 December 202523% built
1 October 202516% built
16 June 202513% built
18 January 202510% built
8 August 20243.4% built
23 April 20240.7% built
24 October 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.