Skip to content

Azra Residence construction photos

22 photos from 4 site inspections, newest first. The percentage is how much of Azra Residence was built on the day of each visit.

21 September 202628% built

11 June 202620% built

30 April 202616% built

20 January 202612% built

Back to Azra Residence construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.