Skip to content

Mada Residences Tower construction photos

56 photos from 5 site inspections, newest first. The percentage is how much of Mada Residences Tower was built on the day of each visit.

23 September 2018100% built

21 March 201891% built

25 September 201776% built

2 April 201760% built

22 August 201622% built

Back to Mada Residences Tower construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.