Arian By Azizi construction photos
6 photos from 2 site inspections, newest first. The percentage is how much of Arian By Azizi was built on the day of each visit.
24 March 20262.0% built
21 January 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.png&w=3840&q=75)
.png&w=3840&q=75)
.png&w=3840&q=75)


