Damac Hills-Bel Air construction photos

71 photos from 9 site inspections, newest first. The percentage is how much of Damac Hills-Bel Air was built on the day of each visit.

16 May 2025100% built

19 September 202487% built

1 April 202470% built

8 November 202348% built

18 July 202338% built

7 February 202318% built

27 October 20229.3% built

31 May 20224.3% built

13 October 20212.0% built

Back to Damac Hills-Bel Air construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.