Damac Hills (2) - Violet 4 construction photos
17 photos from 3 site inspections, newest first. The percentage is how much of Damac Hills (2) - Violet 4 was built on the day of each visit.
13 May 202614% built
28 April 20251.0% built
19 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.