Damac Hills (2) - Verona construction photos
60 photos from 7 site inspections, newest first. The percentage is how much of Damac Hills (2) - Verona was built on the day of each visit.
14 May 2026100% built
25 March 202698% built
14 October 202586% built
23 May 202556% built
5 November 202425% built
17 April 20245.8% built
26 July 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.













.jpeg&w=3840&q=75)
-%2CGF.jpeg&w=3840&q=75)
.jpg&w=3840&q=75)
-DSGS.jpeg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpg&w=3840&q=75)




.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)














.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)