Skip to content

No.23a And 23b Citywalk Residential construction photos

23 photos from 2 site inspections, newest first. The percentage is how much of No.23a And 23b Citywalk Residential was built on the day of each visit.

3 October 2017100% built

29 January 201798% built

Back to No.23a And 23b Citywalk Residential construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.