Skip to content

No.20, No.21a, No.21b And No.22 Citywalk Residential construction photos

24 photos from 2 site inspections, newest first. The percentage is how much of No.20, No.21a, No.21b And No.22 Citywalk Residential was built on the day of each visit.

21 June 2017100% built

29 January 201797% built

Back to No.20, No.21a, No.21b And No.22 Citywalk Residential construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.