No.17, No.18a,No.18b And No.19 Citywalk Residential construction photos
25 photos from 2 site inspections, newest first. The percentage is how much of No.17, No.18a,No.18b And No.19 Citywalk Residential was built on the day of each visit.
20 August 2017100% built
3 January 201798% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.