Skip to content

No.1, No.2a, No.2b, No.3a And 3b Citywalk Residential construction photos

12 photos from 1 site inspections, newest first. The percentage is how much of No.1, No.2a, No.2b, No.3a And 3b Citywalk Residential was built on the day of each visit.

19 December 2016100% built

Back to No.1, No.2a, No.2b, No.3a And 3b Citywalk Residential construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.