Tiger Sky Tower construction photos
30 photos from 6 site inspections, newest first. The percentage is how much of Tiger Sky Tower was built on the day of each visit.
10 September 202610% built
21 May 20269.3% built
31 December 20257.3% built
4 July 20256.8% built
21 January 20255.8% built
14 May 20242.8% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.








.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)


















