Damac Islands - Bora Bora 3 construction photos
12 photos from 4 site inspections, newest first. The percentage is how much of Damac Islands - Bora Bora 3 was built on the day of each visit.
12 October 20264.2% built
4 May 20262.6% built
25 July 20250.3% built
15 January 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.





.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)
.jpg&w=3840&q=75)