Vistara House 2 construction photos
13 photos from 4 site inspections, newest first. The percentage is how much of Vistara House 2 was built on the day of each visit.
12 November 20262.1% built
4 August 20262.1% built
19 March 20261.7% built
26 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.





.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)




