Skip to content

Nadine Residences 2 construction photos

40 photos from 4 site inspections, newest first. The percentage is how much of Nadine Residences 2 was built on the day of each visit.

13 February 2025100% built

2 September 202492% built

5 March 202457% built

26 September 202335% built

Back to Nadine Residences 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.