Equiti Residence construction photos
25 photos from 2 site inspections, newest first. The percentage is how much of Equiti Residence was built on the day of each visit.
10 May 2023100% built
3 November 202283% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.