Azizi. Tulip construction photos

54 photos from 7 site inspections, newest first. The percentage is how much of Azizi. Tulip was built on the day of each visit.

30 July 201799% built

18 July 201795% built

22 February 201774% built

20 September 201652% built

19 May 201632% built

27 January 201620% built

13 May 20152.6% built

Back to Azizi. Tulip construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.