Al Burooj Residence 5 construction photos
43 photos from 4 site inspections, newest first. The percentage is how much of Al Burooj Residence 5 was built on the day of each visit.
24 November 2019100% built
4 September 201997% built
31 October 201870% built
28 March 201835% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.