Timez By Danube construction photos
37 photos taken by Dubai Land Department engineers at 7 site inspections, newest first. The percentage is how much of Timez By Danube was built on the day of each visit.
9 September 202621% built
12 May 202617% built
17 March 20269.7% built
13 January 20267.2% built
28 October 20254.2% built
1 July 20251.2% built
11 February 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.