Oasiz 1 By Danube construction photos
38 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Oasiz 1 By Danube was built on the day of each visit.
29 July 202630% built
15 April 202620% built
24 December 202514% built
16 September 20259.5% built
3 June 20255.7% built
3 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.