Ocean Bay By Samana Developers construction photos
16 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Ocean Bay By Samana Developers was built on the day of each visit.
22 September 20263.2% built
22 June 20261.5% built
9 February 20260% built
11 September 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.