Mackerel Tower construction photos
37 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Mackerel Tower was built on the day of each visit.
20 July 202646% built
1 April 202635% built
15 December 202525% built
16 July 20259.3% built
22 March 20256.5% built
31 October 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.