Flow Residences construction photos

12 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Flow Residences was built on the day of each visit.

14 July 20264.1% built

20 February 20261.0% built

11 June 20250% built

Back to Flow Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.