Edgewater Residences 3 construction photos
28 photos taken by Dubai Land Department engineers at 5 site inspections, newest first. The percentage is how much of Edgewater Residences 3 was built on the day of each visit.
31 August 202630% built
4 May 202615% built
27 December 20258.5% built
15 July 20255.2% built
10 February 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.