Silver Stallions construction photos

26 photos taken by Dubai Land Department engineers at 5 site inspections, newest first. The percentage is how much of Silver Stallions was built on the day of each visit.

7 March 201612% built

17 May 20158.9% built

24 September 20145.3% built

3 March 20144.2% built

2 March 20133.6% built

Back to Silver Stallions construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.