Leven Residences construction photos

18 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Leven Residences was built on the day of each visit.

6 August 202623% built

16 April 202613% built

23 December 20257.4% built

3 March 20250% built

Back to Leven Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.