Nexara Tower construction photos
19 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Nexara Tower was built on the day of each visit.
15 September 202620% built
21 May 202616% built
13 October 20255.9% built
22 April 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.