Rose Gardens 1 construction photos
35 photos taken by Dubai Land Department engineers at 6 site inspections, newest first. The percentage is how much of Rose Gardens 1 was built on the day of each visit.
24 September 202643% built
8 June 202628% built
18 March 202617% built
19 November 202513% built
10 July 20252.1% built
15 January 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.