Onaya Residences By Kaya construction photos

11 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Onaya Residences By Kaya was built on the day of each visit.

19 February 202638% built

11 March 20257.5% built

Back to Onaya Residences By Kaya construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.