Skip to content

Elevia Residences construction photos

7 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Elevia Residences was built on the day of each visit.

30 April 20263.0% built

22 April 20250% built

Back to Elevia Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.