Linea By Holm construction photos
10 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Linea By Holm was built on the day of each visit.
27 July 20260.7% built
7 May 20260.1% built
12 January 20260% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.




.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

