Le Blanc Residence By Imtiaz construction photos
11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Le Blanc Residence By Imtiaz was built on the day of each visit.
7 July 20263.4% built
8 April 20260.4% built
23 October 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.