Chelsea Residences By Damac construction photos

14 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Chelsea Residences By Damac was built on the day of each visit.

7 August 20265.2% built

9 April 20260.7% built

23 October 20250.1% built

24 April 20250% built

Back to Chelsea Residences By Damac construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.