Chelsea Residences 2 By Damac construction photos

14 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Chelsea Residences 2 By Damac was built on the day of each visit.

6 August 20265.4% built

9 April 20260.7% built

5 November 20250% built

5 May 20250% built

Back to Chelsea Residences 2 By Damac construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.