The Boulevard By Prestige One construction photos
13 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of The Boulevard By Prestige One was built on the day of each visit.
23 September 202611% built
23 June 20264.8% built
14 November 20251.1% built
4 December 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.