One River Point construction photos
33 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of One River Point was built on the day of each visit.
21 July 202635% built
27 March 202629% built
18 July 202512% built
12 January 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.