Downtown Residences construction photos
12 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Downtown Residences was built on the day of each visit.
24 September 20261.3% built
22 June 20261.1% built
19 May 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.