W1 construction photos
40 photos from 4 site inspections, newest first. The percentage is how much of W1 was built on the day of each visit.
16 September 202670% built
17 June 202665% built
6 March 202653% built
24 November 202550% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.












.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)



.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)








