Symbolic Zen Residences construction photos

11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Symbolic Zen Residences was built on the day of each visit.

17 April 20262.1% built

10 December 20250.1% built

19 March 20250% built

Back to Symbolic Zen Residences construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.