Skip to content

Raffi By Azizi construction photos

11 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Raffi By Azizi was built on the day of each visit.

25 March 20262.0% built

18 March 20262.0% built

22 January 20250% built

Back to Raffi By Azizi construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.