Skip to content

Api- Barsha Residential Tower construction photos

25 photos taken by Dubai Land Department engineers at 3 site inspections, newest first. The percentage is how much of Api- Barsha Residential Tower was built on the day of each visit.

17 February 202693% built

23 September 202588% built

27 December 202479% built

Back to Api- Barsha Residential Tower construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.