Hillside Residences 1 construction photos
19 photos taken by Dubai Land Department engineers at 5 site inspections, newest first. The percentage is how much of Hillside Residences 1 was built on the day of each visit.
4 May 202615% built
14 November 20256.9% built
2 April 20252.6% built
29 May 20240% built
11 October 20230% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.












.jpeg&w=3840&q=75)
