Skip to content

Rise By Athlon 2 construction photos

4 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Rise By Athlon 2 was built on the day of each visit.

19 May 20260.1% built

3 September 20250% built

Back to Rise By Athlon 2 construction progress

All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.