Esme' Beach Residences construction photos
16 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Esme' Beach Residences was built on the day of each visit.
3 September 202614% built
14 April 20266.0% built
30 October 20253.7% built
21 November 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.