Pier Point 2 construction photos
15 photos taken by Dubai Land Department engineers at 4 site inspections, newest first. The percentage is how much of Pier Point 2 was built on the day of each visit.
14 May 20268.5% built
8 January 20266.3% built
21 July 20250.3% built
19 September 20240% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.