Forum 2 construction photos
7 photos taken by Dubai Land Department engineers at 2 site inspections, newest first. The percentage is how much of Forum 2 was built on the day of each visit.
10 August 20267.0% built
22 July 20250% built
All photos belong to the Dubai Land Department and were taken during its Mashrooi escrow inspections. Mulki shows them as published, with the inspection date and recorded completion each was taken at.
.jpeg&w=3840&q=75)
.jpeg&w=3840&q=75)

.jpeg&w=3840&q=75)


